Showing posts with label Steel Layout. Show all posts
Showing posts with label Steel Layout. Show all posts

Thursday, January 26, 2012

002 Geneva Steel Corp in HO - Steel Mill Basics

Before you design a model railroad you need to know some things:

1. What does the customer want?
2. What are the limitations?
3. What are they asking for that will cause fatal mistakes, i.e. will cause them to not work on the layout?
4. What do we need to know about the railroad?
5. What skills to they have, and more importantly, DON'T have.

So our customer wants a steel mill layout on a shelf in HO scale.  That becomes our purpose for the design.  We'll now start our standard parameters list as a separate file.

The limitations are the small area of 7' x 7' feet, the fact it is in a rehab center's "hospital" room, that lighting is poor and that it needs to be configured for someone with physical limitations and may have to sit to work on it.

Fatal mistakes is always fun.  Our customer usually doesn't want to hear them.  So you have to be VERY subtle in how you explain it to them.  Paul has very limited funds.  The Walthers Blast Furnace list price was $150 just for this one structure.  I see them listed for $300.  To model a whole mill you are talking over $1,000 for just a few structures.  Then we have $300+ in track due to the turnouts, even cheap ones are high.  Another $200 for wood.  If we keep it DC instead of DCC maybe keep it to $50 for power pack and wiring.  We're at $2,000 grand just for basics.  I'm sure this is a deal killer.

The Walther's Blast Furnace Kit, now out of production but available.

What does Scott know about steel making?  A little.  I've spent hours taking photos in Alabama at the mills, but I don't know much about track arrangements.  Good idea for me to get a book, or touch base with Concrete Keith who grew up around them and is modeling a large operation on his railroad.

Railroad Shop
There is a book about steel out and some guides like this one

What skills does the customer have?  He is an EXPERT at soldering and wiring and digital controls.  Wiring and track work shouldn't be a problem.  I'm not sure he has good carpentry skills, so we need to keep the bench easy or find some help.  Don't know about his other skills, but he has had layouts before.  We'll have to ask him.


Before we go any further...he and I have to chat.

Wizdom:
1.  Layouts do cost money and the modeler should have a budget.  The budget can be worked over a period of time as a weekly allowance.
2.  Accessing the skills of the builder is key to design.  Forcing them to hand lay track when they don't like it and never have will kill the layout's likelihood of survival.  Be realistic.  If trackwork is a problem, keep it simple and to off the shelf options.
3.  The designer needs to first educate themselves about the railroad and its key industries.  Knowing the key factors and quirks makes for a very realistic layout.

Tuesday, January 24, 2012

001 Geneva Steel Corp in HO - Layouts for Friends, Take 21


Designing layouts for friends has several big advantages.

1.  It let's me design layouts, which I love.
2.  It forces me to think outside the box and makes me work in areas I normally wouldn't design in like passenger service or cattle transportation.
3.  It let's me learn more about layout design.
4.  Usually they are smaller layouts and its a bigger challenge to fit what is needed into a small space.
5.  You make solid friends when you spend quality time picking their brains!

I've designed many layouts for friends and I get a great kick out of seeing them built!  Its like having a child!

Let me introduce you to my buddy, the Mighty Paul Thorum.  Paul loves his trains as much as I do and wants a layout.  There is a catch to this one.  He has some severe medical issues and currently resides in a rehabilitation center where the nursing staff is helping him get better.  Even with his health issues the Mighty Paul doesn't sit still.  So he needs a layout to fit in a 7' x 7' area in the rehab center.  Oh, there are LOTS of issues with this one!  I'll be glad to design it for you...I'm up for a challenge!  The rehab center has approved the layout...but I'm not sure they know what is coming.


STEEL!

The Mighty Paul says "design me a shelf layout to produce steel and I don't want a tail chaser."  That's all well and good, but he is only giving me a 7' x 7' space to work in.  Ok, we'll see what we can do.

Parameters:

We have to pay very close attention to parameters.  I've seen Paul's room and it is very big for a rehab room. It has big windows, a computer desk, and lots of floor space.  The 7' x 7' space is mostly a corner, but since he has actually more room than that, my first thought is to make it mobile.  Then push it back in the corner.  That means wheels.

No round-de-round means we don't need loops, which is good.  A 7' x 7' area is about what it takes for a 4x8 that we are so used to looking at.  Throw all those plans out.  But maybe we can be more creative with the space.

Paul was talking about N scale, but he really doesn't have the steady hands and fine motor skills for that, so I begged him to stay with HO.  Actually, if he didn't want steel, I'd guide him to On30 since it is cheap and much larger.

The Walther's steel mill kits are what he wants to use. These are big and expensive kits.  We need to make them go a long way.  I've got an ap for that!

Moving layouts, as this one will be, will need some special consideration.  This one can't tip over when pushed to be moved.  It might need to lock in place.  Wiring needs to be kept to the unit itself.  Lots to consider.

So get your ideas ready!  I'll need your help.  Post comments!

For you future Layout Design Wizards, I'm going to start adding words of WIZdom to each post.

Wizdom:
1.  Designing for others is a great skill builder as it forces you into areas you wouldn't normally go, makes you listen to THEIR needs instead of your own, and it makes you attuned to their limitations.
2.  Handicapped people or those with medical limitations have special needs that must be considered when designing a layout.  Good evaluations and heart to heart chats lead to understanding of needs.
3.  Steel mills are HUGE!